The Brief
Our client required 250 off Full prototype Bumper assemblies in production intent materials for 1st phase VB build - pained, assembled using correct welding process with all fixtures and fitting added, boxed and delivered.
Leadtime required:
10 weeks for fist 30 sample sets.
The Solution
Mild Steel tooling manufactured incorporating loose cores that eject with part to create any undercut conditions - this method of manufacture meant that process lead-time for tool manufacture could be dramatically reduced to hit the deadline.
The Benefits
Parts delivered on time so that customer could validate both design and materials to give confidence for next phase of design and development.

Full Front Bumper Assemblies made from Production Intent Material.